Uncategorized

Fire Wall Installation

Fire Wall Installation

Thanks to Elite Precast Concrete & RSG Structures Ltd for installing our 25 artic lorry loads of A1 fire rated walls. Installing 750 tonnes of concrete lego bricks in two days is no mean feat.

New site development update 22/05/20

Progress is coming thick and fast as we enter the last phase of construction at Kings Worthy Business Park. The last slabs of concrete are being laid, three baler pits have been dug ready for machinery to arrive and industrial doors are nearly complete.

Polystyrene waste arriving for recycling

Here is a great example of expanded polystyrene waste having been compacted into blocks before being recycled into new products. This material is an extremely valuable commodity so if you are a manufacturing business looking to divert EPS from landfill and create a new income stream, please get in touch.

Waste packaging buyers

30 tonnes of redundant stock cardboard boxes arriving at Ecogen’s Alresford site today. We are always happy to quote for volumes of unused, ex-stock cardboard, paper and plastic materials. Whether you are having a re-brand or changing labeling we will be happy to help. 01962 732296